In August 2021, Azerbaijan exported carbamide worth USD 11 million, up USD 3.6 or 48.6% from the previous year, Report informs, citing the Export Review of the Azerbaijani Center for Economic Reforms Analysis and Communication.
The nitrogen fertilizer is produced in the SOCAR Carbamide Plant, of which the production capacity is 650-660,000 tonnes of carbamide using 435 million cubic meters of natural gas. The Plant was put into operation on January 16, 2019. 70% of the production is for export.